Aarhus light rail project
Combining UTS expertise for added value
- Reduced LCC and maximized product life through tailor-made hardware solutions and cross-departmental collaboration
- Optimal alignment of the objectives between customer and supplier through Vossloh’s participation in the entire lifecycle of the asset
- Studies and product-specific calculations for an optimized offer:
- Noise and vibration study to protect sensitive equipment from vibration
- DFF 200 fastening solution (former W-Tram) as a vibration-damping and noise-absorbing solution
- Floating installation of slab track with anti-vibration mats
- Rail expansion joint model for smooth gliding of the rail on bridges that required an absorption of movement in the track area
Vossloh‘s contribution
Realization of four different forms of slab track:
- Best possible incorporation of the new line in the various architectural contexts of cities and landscape conditions
- Completion of track work in just 27 months
To reflect the character of the environs, the new link incorporates various slab track designs.